Advertising LED display:
Indoor and outdoor LED displays, because of its characters of high
brightness, low working voltage, low power consumption,
environmental friendly, long life span, impact resistance and
stable functions, have get rapid growth and have attracted more
people’s attention.
LED display is controlled by computer and can play all kinds of
information in the form of pictures, Videos, texts. (Such as 3D
animation, Video, TV and DVD program, Live show).It has strong
practical applicability.
LED display has a wide development perspective. It is currently
applied in bus stations, docks, airports, shopping plazas, banks,
bourse exchanges, building market, industrial enterprise management
and other public places .It will have a even more bright future.
Notes: This is the structure Chart. Parts in black are metal cube.
1: height of our cabinet 480mm, the green line is the virtual
Position of the cabinet installation.
2: Width of our cabinet 480mm, the distance between two cores of
two adjacent metal cubes.
3: The Metal cube on the bottom of the
structure.requirements:40mm*40mm.surface smooth and in horizontal,
without unevenness.
4: Square connect sheet, size: 70mm*70mm, install at the corner of
cabinet.
5: Rectangular connect sheet, size: 70mm*25mm, install at the
middle of cabinets.
6: It is a horizontal metal cube, Weld a horizontal metal cube
every four cabinets’ height to make sure the screen is stable. The
soldering position should be 60mm above the bottom line of
480mm*480mm cabinet.
Manunal of installation
1 The screen should be installed from the bottom of the
structure,from the middle to both sizes,In order to keep the better
effect of the led screen,please make sure that the gap between two
cabinets can not be more than 1mm..
2 When finished,you can install the second row,installation is the
same as the first row,but note that the cabinets from the second
row should be locked in the enclosure slots which is from the first
row,the gap between the first and the second row should not be more
than 1mm..
3 And so on,the installation is the same as above till finish.